Size a load bank for generator testing in kW, including the voltage derating most guides skip. Enter nameplate kVA, test load and site voltage.
Tell us what you need to power and we will confirm the exact model, voltage and configuration — usually within 24 hours.
Almost every sizing guide stops at one line: match the bank to the generator’s kW rating. That is correct as far as it goes, and it is exactly where most projects fail.
Two things break that simple rule. First, generators are sold in kVA while banks are rated in kW, so a 625 kVA set is a 500 kW machine at 0.8 power factor — not a 625 kW one. Second, and far more often missed: a resistive bank’s output falls with the square of the voltage ratio.
A 1000 kW bank rated at 480 V, connected to a 380 V site, does not deliver 1000 kW. It delivers about 627 kW, because resistance is fixed and power follows V²/R:
D = (site voltage ÷ rated voltage)²
Run the same bank on a 240 V site and you are down to roughly a quarter of its nameplate. This is why ordering by kW alone produces a bank that cannot reach full load in the yard — the paperwork passes and the test does not.
A resistive bank loads the engine, fuel system and cooling. It does not stress the alternator the way a real installation does. If the site load includes motors, pumps, transformers or HVAC compressors, the alternator has to hold voltage through an inductive load — that is what a reactive bank tests, normally at 0.8 power factor.
For routine maintenance testing, resistive is enough. For commissioning, acceptance tests and anything mission-critical, specify combined resistive-reactive.
Banks are built in discrete steps: 50, 75, 100, 125, 150, 200, 250, 300, 400, 500, 600, 750, 800, 1000, 1250, 1500 and 2000 kW. Always round up to the next standard size, never down. Above roughly 1200 kW, units are supplied in ISO containers.
You can, but you will only prove 60% of its capability. A set that runs cleanly at 300 kW can still fail at 500 kW — that is precisely the failure mode load bank testing exists to catch. For standby sets, 80% is the practical minimum; for prime power and critical sites, test at full rating.
Almost always voltage. Check the bank’s nameplate voltage against the actual site voltage and apply the square rule above. A bank rated 480 V running at 400 V loses about 30% of its capacity before you connect a single cable.
The NFPA 110 annual profile for emergency systems is 30 minutes at 50% followed by 60 minutes at 75%. Commissioning tests usually run longer: hold rated load until coolant, oil and exhaust temperatures stabilise, typically one to four hours.
Wet stacking is unburnt fuel and soot accumulating in the exhaust when a diesel set runs persistently below about 30% load. A load bank is the standard cure — run the set at 70–80% for a few hours to burn the deposits off, then keep routine test load high enough that it does not return.